From: route@monster.com
Sent: Thursday, January 28, 2016 5:16 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Donnelly
Circle, Orlando, FL.,
32821
407.702.7866
DLong322@gmail.com A
Telecommunications Project Manager/Construction Manager with over 20+ years
of experience possessing an in-depth knowledge of both the business and
technical aspects concerning the wired/wireless telecommunications and
electric utility industries.
EXPERIENCE Mastec
Network Services, Maitland, FL February, 2011 – May
24, 2013 Project/Construction
Manager UMTS
PM/CM for all project cross functional phases (Civil & Mods); Scoping,
Site Acquisition, NTP, Budgets, Scheduling, QA/QC, Tracking and
Closeouts. Direct responsibility for resolving critical issues,
troubleshooting, PIM testing, sweeps & alarm clearing for all UMTS
projects. Single point of contact with wireless customer to
consistently meet ‘On Air’ timelines. · Oversight
of all projects throughout NFL with total revenues in excess of
$10,000,000.00, including site acquisition, materials management,
construction, permits and subcontractor resources. · Reconciled
subcontractor/vendor invoices on behalf of company resulting in an annual
savings of $300,000.00 Century
Link, Altamonte Springs, Fl May, 2010 – February 2011 Project
Manager Project
Manager for special projects in the Central Florida Region taking ownership
of site preparation, circuit design, engineering, materials & construction
schedules to meet “Forecasted” turn up dates. Extensive network and power
system upgrades were also performed during ‘Maintenance’ windows. · Consistently
exceeded Century Link “On-Air” timelines by five to ten days resulting in “On
Time” sales orders. · Pre-Construction
Site walks with multiple vendors for site work and QC of post installations. Progress
Energy, Orlando, FL December, 2008 - May, 2010 Senior
Technical Project Manager Wireless
Business single point of contact for Progress Energy Florida. Directed &
managed all aspects of cell tower construction & generator installations
located on Progress Energy Facilities including, but not limited to;
Construction and Maintenance of towers, Encroachment, Structural Analysis,
Engineering, SOW, RFQ, NTP, Source Vendors, Schedule Outages, Invoicing,
Database Updates, Emergency Response, NESC & OSHA compliance as well as
regulatory recordkeeping. Elected Company Safety Committee Chairman. · Consistently
exceeded Revenue Goals · Significantly
increased Safety margin by revising process to review switching orders Tower
Cloud, St. Petersburg, FL 2005 – September, 2008 Manager,
Construction & Outside Plant Directly
responsible for all aspects of the design, permitting, engineering,
construction and maintenance of the optical & wireless cell tower fiber
backhaul network throughout Florida and Georgia. Responsibilities
include: Site Surveys, Site Acquisition & Landlord Negotiations, Route
Design, Permitting, Budget Estimates, Site Layout, Redundant Power Systems
and Strategic Planning. Consistently exceeded project deadlines by developing
comprehensive implementation plans. Responsible for submitting projected
budget requirements to finance group for Cap-ex and Op-ex projects such as
fiber & wireless builds into customer cell sites and MTSO’s, electrical
substations, building entry laterals plus risers (high rise buildings),
Wi-Fi, VPNs, WAN, LAN, DAS testing, MW links, fiber optic splicing, testing
and documentation. Additionally responsible for writing the scope of work,
contracts and NTP’s for contractors to obtain value added services for
construction, engineering and permitting. Responsible for maintaining the
network by working closely with multiple carriers, utility companies,
railroads, cell tower companies, local and state agencies, end users and
property owners. Directly responsible for emergency system restoration
(24/7/365). Ensured NESC & OSHA compliance, adhering to electric utility
distribution and transmission specifications & practices for multiple
electric utilities joint use attachments. Established good working
relationship with cellular providers, cell tower companies and permitting
authorities. · Negotiated
space & lease arrangements for rooftop locations throughout the State · Expedited
builds and reduced costs by working with Joint Use holders and Permitting
Authorities Progress
Telecom, Inc. /EPIK Communications, Inc.
, St. Petersburg, FL/Orlando, FL 2000
- 2005 Manager,
Outside Plant, Facilities & Project Management
Responsible
for the direct oversight of the company’s Eastern Regional Telecom OSP
network including Progress Energy’s optical network in Florida and the
Carolinas. Managed all physical plant projects, including POP site
construction totaling over $100M in capital costs, In addition, directly
responsible for OSP engineering, construction, maintenance and project
management. Helped develop project managers by working with them to develop
project plans, timelines and objectives. Also directly responsible for
maintaining the long haul regeneration sites in Florida and Georgia along
with coordinating maintenance for ‘joint’ sites throughout Progress Energy’s
regional footprint. Responsibilities included: OSP feasibility studies,
interfacing with sales and senior/executive management, developing
implementation plans, addressing customer expectations to ensure positive
outcomes, negotiated favorable and cost effective contract provisions, direct
oversight of materials and resource allocation, monitoring project budgets,
scope of work and on time delivery to the customer. Scope of projects managed
included: collocation design builds, fiber optic rings for cellular & wired
telecom carriers and wireless backhaul. Responsible for maintaining the
multi-state OSP network including: working closely with multiple carriers,
electrical utilities and telecom providers, local and state agencies, end
user occupants and landlords for a geographic territory extending from
Florida to New York. Directly responsible for emergency system restoration
(24/7/365), including physical plant, SONET, Ethernet, Wi-Fi systems, power
or HVAC failures. Responsible for ensuring NESC & OSHA compliance
of workplace safety for company employees & contractors. Directly
supervised a professional and technical staff, including contract
employees. Note; Tower Cloud was formed at the time of the sale of
Progress Telecom to Level 3. · Drove
major construction POP site design builds in Orlando & Tampa · Combined
Engineering and Construction for an increase in production and lower overall
costs Hyperion/Adelphia
Business Solutions, Inc., Orlando, FL 1999 - 2000 PM/CM
Responsible
for PM/CM of the company’s OSP projects including; Site acquisition, Landlord
negotiations, civil work & construction of long haul regeneration sites
for projects located throughout the state of Florida. Scope of projects
managed: Florida long haul network, metro fiber optic rings, end user
entrance facilities and associated POP construction build outs. Liaison to
Adelphia Cable Upgrade Department to help coordinate the Hybrid Fiber/Coax
broadband upgrade design and implementation. Responsibilities included: Provide
direction and supervision of employees, contractors and subcontractors as
needed to ensure projects were being completed in accordance with company
strategic plans/goals, on time and within budgetary constraints according to
the project specifications, proactively preventing and resolving potential
cost overages and delays. Directed engineering, permitting and
construction associated with the physical plant, dark fiber & conduit
leasing, day one installation, collocation, turn-up and test of the optical
network. Responsible for maintaining the OSP network, which included
working closely with multiple carriers, electric utility companies,
telecommunication carriers, local and state agencies, end users, occupants
and landlords throughout the State of Florida. On call 24/7 for
emergency restoration. Note; Hyperion was spun into Telcove and
then was purchased by Level 3. · Negotiated lease and supervised construction of Weber Street
substation POP · Negotiated conduit lease and fiber maintenance agreement with OUC Time
Warner Communications, Inc., Orlando, FL 1995 -
1998 Construction
Supervisor/Safety Coordinator
Directly
responsible for the construction of the company’s fiber optic network upgrade
and Telecom backbone. Direct oversight for the build out of over 3,600
linear miles of Optical Plant in a three-year period throughout Florida,
working with Progress Energy, FP&L, OUC, Sumter Electric, KUA and TECO.
Coordinated design and placement of actives, passives and power supplies
throughout the network. Reduced the division’s reportable accidents by
proactively reinforcing a “Safety First” philosophy by conducting monthly
Safety meetings. · Increased
daily production without an increase in costs · Worked
on converting nodes into hub sites throughout Time Warner territory TCI
Cablevision of Oregon, Portland, OR 1990 -
1995 OSP
Engineer/Project Manager
Responsible
for RF and Optical engineering and construction, make ready mapping, permitting
and oversight of fiber optic network upgrade, including construction of hub
sites throughout the Metro area. Designed, constructed and spliced fiber and
coaxial system. Served as the company’s site acquisition manager in obtaining
easements and various property documents necessary to facilitate project
development and completion. Served as the company’s safety trainer for a
workforce in excess of 125 professional, technical and field personnel. · Supervised
construction of design-bid-build hub sites throughout the Tri-County metro
area · Worked
directly with permitting agency(s) (Utility Companies, State DOT, Cities
& Counties) to expedite permits placing the Portland Metro project ahead
of all others in the company wide upgrade Pacific
Power & Light Company, Medford, OR 1979 - 1990 Equipment
Operator/Assistant Plant Repairman/Meter Reader Responsibilities
included; worked on a line crew building & maintaining hydro plants,
substations, transmission & distribution lines, both aerial and
underground, working in close proximity to energized power lines while
operating various types of utility equipment including; class 4 & 5 line
trucks, boom & bucket trucks, tensioners, insulated tools, saws, winches
& hand tools in erecting, troubleshooting & maintaining the company’s
electric utility system. Repaired transformers, switches and other electric
utility equipment. Read company electric meters and collected past due
payments. · Broke
ground & built Lost Creek substation · Construction
upgrades for Lemolo 1 & 2 hydro plants EDUCATION
AND PROFESSIONAL TRAINING
Portland
Community College General
Business Administration Curriculum (1991 – 1995) First Aid CPR Recertified April
(2013)
Railroad Safety Trainer recertified
August (2008) Progress Energy substation safety certified
(2005)
Tropos, Motorola Canopy, Orthogon & Adtran
(2004) Cisco, Alcatel, Juniper & ONI DWDM
Configuration
(2001)
Nortel Networks Products Overview
(2000)
Fujitsu Products Overview
(1999)
Microsoft Project Management I & II
(1999)
AT&T Fiber Design & Splicing
(1992)
NCTI Broadband & Fiber Optic Tech
(1991)
Medic First Aid Trainer (1991) |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|